Electro Mechanical Switch
MCLI’s electromechanical switches are high quality, intricately built switches that are used to route signal through different transmission paths. Our electromechanical switches are extensively used in various broad range systems from simple test bench applications to intricate switch matrixes systems. We have ranges up to 26 GHz and offer multiport solutions up to SP6T (single pole six throw). If you are looking for a multitude of options, we can spec different mechanical and connectorized packages to meet your needs.
High Switch Cycle Reliability
Solid Build Construction
Many Available Configurations
Browse by category
Browse all Electro Mechanical Switch
Filters
Actuator
Frequency Range (GHz)
Insertion Loss (dB)
Isolation (dB)
VDC
VDC COM
CURRENT (mA) Max
Showing 25–36 of 474 results
Part # | Actuator | Frequency Range (GHz) | Insertion Loss (dB) | Isolation (dB) | VDC | VDC Com | Current (Ma) Max | Lead Time | Notes | Action |
---|---|---|---|---|---|---|---|---|---|---|
A6-8-M | MOMENTARY | DC - 26.5 | 0.7 | 50 | 28 | (–) | 150 | 6-8 Weeks | N/A | Request Quote |
A6-8-MS | MOMENTARY | DC - 26.5 | 0.7 | 50 | 28 | (–) | 150 | 6-8 Weeks | N/A | Request Quote |
C1-1-FIS | FAILSAFE | DC - 1.0 | 0.2 | 90 | 28 | (–) | 190 | 6-8 Weeks | N/A | Request Quote |
C1-1-F/12 | FAILSAFE | DC - 1.0 | 0.2 | 90 | 12 | (–) | 200 | 6-8 Weeks | N/A | Request Quote |
C1-1-FL | FAILSAFE | DC - 1.0 | 0.5 | 60 | 28 | (–) | 125 | 6-8 Weeks | N/A | Request Quote |
C1-1-FL/15 | FAILSAFE | DC - 1.0 | 0.2 | 90 | 15 | (–) | 190 | 6-8 Weeks | N/A | Request Quote |
C1-1-LI | LATCHING | DC - 1.0 | 0.2 | 90 | 28 | (–) | 125 | 6-8 Weeks | N/A | Request Quote |
C1-2-LI | LATCHING | DC - 2.0 | 0.2 | 90 | 28 | (–) | 125 | 6-8 Weeks | N/A | Request Quote |
C1-2-LLIS | LATCHING | DC - 2.0 | 0.2 | 90 | 28 | (–) | 125 | 6-8 Weeks | N/A | Request Quote |
C1-3-F | FAILSAFE | DC - 4.0 | 0.25 | 80 | 28 | (–) | 125 | 6-8 Weeks | N/A | Request Quote |
C1-3-FIS | FAILSAFE | DC - 4.0 | 0.25 | 80 | 28 | (–) | 190 | 6-8 Weeks | N/A | Request Quote |
C1-3-L/12 | LATCHING | DC - 4.0 | 0.25 | 80 | 12 | (–) | 125 | 6-8 Weeks | N/A | Request Quote |